Industrial Construction

The fastest growing part of CCI’s business is industrial projects and includes the following:

  • Torani Syrups - high-volume, custom-bottling plant, offices and testing/catering kitchen
  • Remote Encoding Center for the U.S. Postal Service - with special electrical/data and high security specifications
  • Kobe Precision - silicon wafer remanufacturer facility
  • LSG/Sky Chef - industrial airline catering kitchen


233 E. Harris Street, South San Francisco

Arch: Richard Vaterlaus
Eng: Robert Vaterlaus

This is the new corporate headquarters for the nearly 100-year-old R. Torre & Company, the makers of Torani Syrups (a high-volume, custom-bottling plant). CCI's scope of work included seismic retrofitting of the building, the construction and coordination of two high-volume bottling lines, as well as offices and a testing/catering kitchen. As Torani exploded with the coffee boom of the 90s, CCI was able to accommodate them with a fast-track design-build team.




31031 Huntwood Drive, Hayward - KOBE Precision Inc., Building "D"

Arch: Makita Design
Eng: Greene Engineers
        R. B. Gould Engineers

CCI played an integral role as both the general contractor and as part of the pre-construction design team on this state-of-the-art silicon wafer remanufacture facility. The project includes a series of clean rooms from class 10 to class 10,000, all connected by an underground trench system with the dual purpose of utility distribution and HAZMAT containment. The exterior equipment pad has a very sophisticated waste treatment facility as well as nitrogen generation and high-end and low-end D.I. water plant. The project was completed on time and on budget for a grand opening for customers such as IBM Corp, Intel Corporation, and Texas Instruments.




CCI Commercial Constructions and Improvements
Two Henry Adams St, Suite M-99, San Francisco, CA 94103
Phone (415) 626-3338 FAX (415) 626-3406
General Information: info@cci-gc.com
General Contractor LIC #687025